Which samples were reviewed?
Ask the supplier to identify every bottle used for the recommendation and any formats not yet tested.
Supplier questions
A procurement and engineering checklist covering bottles, output evidence, change parts, controls, testing, documentation and supplier responsibilities.
Direct answer
Ask the supplier to explain the recommended route against the actual bottle set, show how the quoted output will be evidenced, define changeover and line-interface scope, and state what remains the buyer’s responsibility. The strongest answer is tied to samples, drawings, recorded tests and an agreed handover point. Generic assurances about speed or versatility should not replace a written technical scope.
Technical guidance
Ask the supplier to identify every bottle used for the recommendation and any formats not yet tested.
Agree which format defines stability, orientation, scuffing or changeover risk.
State whether bottles are simply accumulated, singulated, upright or oriented to a feature.
Request a written list of untested conditions, excluded bottle formats and assumptions.
Technical guidance
Separate the machine from loading equipment, conveyor, guarding, controls changes, installation and training.
List dedicated parts, adjustable settings, tools, storage and the expected operator sequence.
Agree samples, run conditions, videos, event logs, settings, FAT records and open-item closure.
Confirm manuals, drawings, I/O, utilities, spares, maintenance and support contacts.
Decision aid
| Area | Supplier response needed | Buyer evidence to provide |
|---|---|---|
| Bottle set | Confirmed formats, exclusions and trial status | Samples, drawings, production variation and surface requirements |
| Output | Definition, test point, conditions and permitted intervention | Sustained line demand and downstream stop-start pattern |
| Machine scope | Included loading, outfeed, guides, guarding and controls | Existing equipment to retain and line boundary |
| Changeover | Parts, adjustments, sequence and settings record | Format frequency and acceptable change time |
| Acceptance | FAT/SAT scope, evidence and action closure | Named witnesses, acceptance criteria and site readiness |
| Support | Documents, spares, installation, commissioning and training | Site contacts, access, utilities and production availability |
Buyer questions
The supplier should identify the sample bottles, drawings or photographs used for selection and state whether the recommendation is trialled, calculated or based on a similar application. The buyer should not assume that one bottle proves the full range. A sample register with clear IDs prevents later disagreement about which formats were included.
Untested bottles should be listed as an open condition rather than implied to be covered.
Ask where the output is measured, which bottle and machine configuration were used, how long the run lasted, what downstream condition was simulated and which interventions were permitted. Published figures can help shortlist a route, but project acceptance needs evidence tied to the actual bottle and handover point.
Use the FAT and SAT guide to define the proof.
The quotation should distinguish included change parts, optional parts, adjustable settings and tools. It should also state how settings are recorded, where parts are stored and which bottle formats require dedicated components. A machine that runs several bottles during a trial may still need an impractical changeover unless the sequence is demonstrated.
Request a settings sheet and parts list for the agreed formats.
The quotation should name the party responsible for each mechanical, electrical, controls and safety boundary. Define who supplies conveyors, guide rails, cables, field devices, software changes, guarding modifications, installation labour, commissioning and complete-line validation. Gaps between packages are a common source of delay and unplanned cost.
The site-survey guide helps expose those interfaces early.
Related guidance
Continue with this related specification or integration resource.
Continue with this related specification or integration resource.
Continue with this related specification or integration resource.
Continue with this related specification or integration resource.
Next step
Use the existing enquiry route with bottle dimensions, photographs or samples, target sustained output, downstream machinery and available layout information.
Specification support
Lancing UK can advise whether a compact rotary unscrambler, automatic bottle unscrambler or wider line-infeed package is the correct route.